NOTICE -- The LBA-ECO Project website is no longer being supported.  This archive is a snapshot, as it existed in 2013, of the LBA-ECO website, maintained by NASA Goddard Space Flight Center, and now archived at the ORNL DAAC.  Links to external websites may be inactive. Final data products from the LBA project can be found at the ORNL DAAC.
banner
banner banner banner banner banner banner
banner banner banner banner banner banner banner
home aboutlibrarynews archivecontacts banner

spacer
banner
Investigations
Overview
Abstracts & Profiles
Publications
Research Sites
Meetings
Synthesis Groups
LBA-HYDROMET
LBA-Air-ECO
Logistics
Overview
Field Support
Travel
Visa
Shipping
Data
  Overview
Find LBA Data
Investigator Checklist
Process & Policy
Documentation & Archive
Training & Education
  Overview
Activities Summary
T&E Goals
Student Opportunities
  Folha Amazônica
 
spacer

View Scheduled Site Visit

LBA Group: TG-05 (Potter / Carvalho / Oliveira)

Created on: 26-Jul-2005

Last Revised: 26-Jul-2005 10:38 EST by Raimundo Cosme Oliveira Jr.

Status:  LBA-ECO with Pending CNPq

Region:  Pará Western (Santarém)

Contact Person:  Raimundo Oliveira Jr. (COSME)

Contact Email:  cosme@cpatu.embrapa.br

Start Date:  01 AUG 2005

End Date:  31 AUG 2005

Planned activities:

Maintenance / Technical Support

DESCRIPTION

Manutencao e suporte durante os dias 01-02, 16-17 e 30-31 de agosto de 2005

PARTICIPANTS

Incoming Visitors:  Raimundo Cosme Oliveira Jr.

On-Site Personnel:  Wanderley de Oliveira Pereira


LOGISTICS NEEDS

There are no logistics items available at this region.



MEASUREMENT INFORMATION : None Specified

ADDITIONAL COMMENTS

O carro sera utilizado somente nos dias acima referidos



Skip navigation linksHOME | ABOUT | LIBRARY | NEWS ARCHIVE | CONTACTS | INVESTIGATIONS | LOGISTICS | DATA |TRAINING & EDUCATION

NASA logo
ORNL DAAC
Get Acrobat Reader