NOTICE -- The LBA-ECO Project website is no longer being supported.  This archive is a snapshot, as it existed in 2013, of the LBA-ECO website, maintained by NASA Goddard Space Flight Center, and now archived at the ORNL DAAC.  Links to external websites may be inactive. Final data products from the LBA project can be found at the ORNL DAAC.
banner
banner banner banner banner banner banner
banner banner banner banner banner banner banner
home aboutlibrarynews archivecontacts banner

spacer
banner
Investigations
Overview
Abstracts & Profiles
Publications
Research Sites
Meetings
Synthesis Groups
LBA-HYDROMET
LBA-Air-ECO
Logistics
Overview
Field Support
Travel
Visa
Shipping
Data
  Overview
Find LBA Data
Investigator Checklist
Process & Policy
Documentation & Archive
Training & Education
  Overview
Activities Summary
T&E Goals
Student Opportunities
  Folha Amazônica
 
spacer

View Scheduled Site Visit

LBA Group: CD-03 (Fitzjarrald / Moraes)

Created on: 07-Sep-2001

Last Revised: 07-Sep-2001 17:50 EST by Ricardo Sakai

Region:  Pará Western (Santarém)

Contact Person:  Ricardo K. Sakai

Contact Email:  

Start Date:  28 SEP 2001

End Date:  20 OCT 2001

Planned activities:

Data Collection

DESCRIPTION

Support for tethered balloon launching and maintenance trip - Support for UFSM team in lauching tethered balloon at km 77 site. Maintenance trip for data acquision systems and tower instruments at km 77, Belterra, Km117, Mojui, and Guarana sites. - 1) Support for the USFM group to launch tethered balloon in the pasture site. 2) Maintanance trip to data acquisition systems and instruments at km77, Belterra, Km 117, Jamaraqua, Mojui, and Guarana sites.

PARTICIPANTS

Incoming Visitors:  Otávio C Acevedo, Osvaldo Luiz Leal de Moraes, Ricardo Sakai, Rodrigo Da Silva

Other Visitors:  Eleazar Brait

On-Site Personnel:  None


LOGISTICS NEEDS

There are no logistics items available at this region.



MEASUREMENT INFORMATION

Balloon Platform Measurements; Boundary Layer Studies

ADDITIONAL COMMENTS

I am not sure when Osvaldo's crew will be arriving in Santarem. I think Dave told me something like Sept. 28, 2001. Ricardo Sakai



Skip navigation linksHOME | ABOUT | LIBRARY | NEWS ARCHIVE | CONTACTS | INVESTIGATIONS | LOGISTICS | DATA |TRAINING & EDUCATION

NASA logo
ORNL DAAC
Get Acrobat Reader