NOTICE -- The LBA-ECO Project website is no longer being supported.  This archive is a snapshot, as it existed in 2013, of the LBA-ECO website, maintained by NASA Goddard Space Flight Center, and now archived at the ORNL DAAC.  Links to external websites may be inactive. Final data products from the LBA project can be found at the ORNL DAAC.
banner
banner banner banner banner banner banner
banner banner banner banner banner banner banner
home aboutlibrarynews archivecontacts banner

spacer
banner
Investigations
Overview
Abstracts & Profiles
Publications
Research Sites
Meetings
Synthesis Groups
LBA-HYDROMET
LBA-Air-ECO
Logistics
Overview
Field Support
Travel
Visa
Shipping
Data
  Overview
Find LBA Data
Investigator Checklist
Process & Policy
Documentation & Archive
Training & Education
  Overview
Activities Summary
T&E Goals
Student Opportunities
  Folha Amazônica
 
spacer

View Scheduled Site Visit

LBA Group: CD-10 (Wofsy / Kirchhoff / Camargo / A. Nobre)

Created on: 09-Jan-2001

Last Revised: 09-Mar-2001 19:48 EST by Scott Reid Saleska

Region:  Pará Western (Santarém)

Contact Person:  Scott Saleska

Contact Email:  

Start Date:  22 MAR 2001

End Date:  11 APR 2001

Planned activities:

Instrument Set-up / Installations

DESCRIPTION

Eddy installation - install eddy flux and associated instruments - Eddy flux instrument installation, and biometry data collection/quality assurance with students

PARTICIPANTS

Incoming Visitors:  Alfram von Hoessle Bright, John Walter Budney, Bruce Channing Daube Jr., Scott Reid Saleska

Other Visitors:  Bruce Daube, Alfram Bright, John Budney

On-Site Personnel:  None

SITES

Pará Western (Santarém): km 67 Primary Forest Tower Site

LOGISTICS NEEDS

There are no logistics items available at this region.



MEASUREMENT INFORMATION

Tower Measurements; Carbon Flux

ADDITIONAL COMMENTS

Possible itinerary: 22 March, 19:55pm: Daube, BUdney, Bright arrive Santarem on Varig #2231 from Manaus 23 March, am: Saleska arrives from Belem. 23 March: settle in, do police registrations. Inspect instrument shipment (at Fabiano's warehouse?) If time, load shipment onto Fabiano's truck. 24 March (if saturday work allowed). Truck equipment to site at km 67. 25 March (off). 26-30: in field, stay at basecamp. 2-6 April. In field, stay at basecamp Work until done.



Skip navigation linksHOME | ABOUT | LIBRARY | NEWS ARCHIVE | CONTACTS | INVESTIGATIONS | LOGISTICS | DATA |TRAINING & EDUCATION

NASA logo
ORNL DAAC
Get Acrobat Reader